Project Guide

Planning a Waste Incineration Project? Prepare These Four Things

1 — Material

What you will burn (medical, hazardous or municipal waste), its calorific value and moisture.

2 — Capacity

How many kilograms or tons per hour, and how many hours per day.

3 — Fuel

Electricity, diesel, LPG or natural gas available on site.

4 — Local emission standard

The limits your authority requires — this decides the combustion chamber, residence time and whether a wet scrubber is needed.

Send these four items through Get a Solution and our engineers will reply with a configuration and budget proposal within 24 hours.

Prepare my quote