Project Guide
Planning a Waste Incineration Project? Prepare These Four Things
1 — Material
What you will burn (medical, hazardous or municipal waste), its calorific value and moisture.
2 — Capacity
How many kilograms or tons per hour, and how many hours per day.
3 — Fuel
Electricity, diesel, LPG or natural gas available on site.
4 — Local emission standard
The limits your authority requires — this decides the combustion chamber, residence time and whether a wet scrubber is needed.
Send these four items through Get a Solution and our engineers will reply with a configuration and budget proposal within 24 hours.